This website uses cookies

We use cookies to enhance your experience and support COUNTER Metrics for transparent reporting of readership statistics. Cookie data is not sold to third parties or used for marketing purposes.

Skip to main content
null
IMAPSource Conference Papers
  • Menu
  • Articles
    • Ceramics Conference Papers
    • Device Packaging Conference Presentations
    • EMPC Conference Proceedings (IMAPS Europe)
    • General
    • High Temperature Conference Papers
    • IMAPS Chapter Conferences
    • Silicon Photonics Packaging Summit
    • Symposium Proceedings
    • Technical Articles
    • All
  • For Authors
  • Editorial Board
  • About
  • Issues
  • Journal Micro & Elect Pkg
  • search
  • LinkedIn (opens in a new tab)
  • RSS feed (opens a modal with a link to feed)

RSS Feed

Enter the URL below into your favorite RSS reader.

http://localhost:15120/feed
ISSN 2380-4505
Symposium Proceedings
Vol. 2012, Issue 1, 2012January 01, 2012 EDT

Propagation Delay Analysis in 3D Stacked Memory using Novel MOS Depletion Layer Modeling Approach for Through Silicon Via

Kaushal Kannan, Sarma G. Harihara, Sukeshwar Kannan,
Three-Dimension (3D)Through Silicon Via (TSV)Memory
https://doi.org/10.4071/isom-2012-TP25

Articles in Vol. 2012, Issue 1, 2012

Vol. 2012, Issue 1, 2012
  • Optimizing Product Cost with Supply Chain Cost Modeling
    Chet PaleskoAlan Palesko
  • Temporary Bonding and Debonding - An Overview of Today's Materials and Methods
    IMAPS symposium Proceedings and Conference Papers
  • ULTRA THIN CHIPS STACKING ON TSV SILICON INTERPOSER USING BACK-TO-FACE TECHNOLOGY
    G. ParèsF. SchneggA. AttardD. CruauF. De CrecyA. N'hariR. AnciantG. KlugH. LuesebrinkK. MartinschitzC. KarouiG. Simon
  • NiV Stress Control Utilizing PVD with an Ar / N2 Gas Mixture
    G. SeryoginS. GolovatoS. SmithK. WilliamsN. LimburnA. WinnG. MundadaG. Adema
  • Thermal Stress and Creep Strain Analyses of a 3D IC Integration SiP with Passive Interposer for Network System Application
    Sheng-Tsai WuJohn H. LauHeng-Chieh ChienYu-Lin ChaoRa-Min TainLi LiPeng SuJie XueMark Brillhart
  • Solution for HVM TSV Etch Process
    Rajiv RoyMatt Wilson
  • Use of 3D Packaging Technology for Satellite Active Antennas Front-ends
    B. BonnetR. ChiniardH. LegayD. NevoP. MonfraixO. VendierP. CoudercJ.-L. Cazaux
  • Pushing the 3rd Dimension – Floppy Wafers, Die and Packages? Stress Induced Chip Package Interactions on Thin Mobile Devices
    Mark NakamotoWei ZhaoRiko Radojcic
  • New Build-up Insulation Material Based on Cyclo-Olefin Polymer for High-Performance IC Packages
    Yohei TateishiMakoto FujimuraTakashi IgaToshihiko Jimbo
  • The Application of PEEK to Implantable Electronic Devices Packaging: Water Permeation Calculation Method and Maximum Lifetime with Desiccant
    Nathaniel DahanNick DonaldsonStephen TaylorNuno Sereno
  • Control of Package Warpage by Package Substrate Design for Low Profile Package-on-Package Structure
    Takeshi FurusawaNaomi KawamuraToshiki FurutaniTakashi Kariya
  • Precision Jetting of Glob Top Materials – a methodology for process optimization
    K.-F. BeckerM. KochJ. BauerT. BraunR. AschenbrennerM. Schneider-RamelowK.-D. Lang
  • Simulation and Experiment of Molded Underfill Voids
    MyoungSu ChaeEric OuyangJaeHan ChungDokOk YuSeonMo GuGwang KimBilly Ahn
  • Enabling the 2.5D Integration
    John Y. XieHong ShiYuan LiZhe LiArif RahmanKarthik ChandrasekarDeepa RatakondaManish DeoKaushik ChandaVincent HoolMJ LeeNagesh VodrahalliDale IbbotsonTarun Verma
  • Managing Voids in Underfill Process with 5-micron Gap Under Large Die
    Hanzhuang LiangNordson Asymtek
  • Through-Silicon-Via (TSV) for silicon package: ″via-bridge″ approach
    Y. LamyS. JoblotC. FerrandonJ.F. CarpentierG. Simon
  • Packaging of High Frequency, High Temperature Silicon Carbide (SiC) Multichip Power Module (MCPM) Bi-directional Battery Chargers for Next Generation Hybrid Electric Vehicles
    Z. ColeB. PassmoreB. WhitakerA. BarkleyT. McNuttA.B. Lostetter
  • Multi-functional carbon nanotube composites with super-hydrophobic properties
    Sunghoon ParkEunhyoung ChoPaul ThielemannJinseung SohnKunmo ChuSunghee LeeDongouk KimByunghoon Kim
  • New Flip-Chip Interconnect Technology for High Performance and High Reliability Applications
    Eiji YamaguchiMutsuo TsujiNozomi ShimoishizakaTakahiro NakanoKatsunori Hirata
  • Glass-Insulated Bonding Wire Scales to Support advances in Miniaturization
    Dominik Stephan
  • Pd-coated Cu Wire Bonding Reliability Requirement for Device Design, Process Optimization and Testing
    Inderjit SinghShin LowSyu Fu SongChen Shih JungLin Ming SanIvy QinCuong HuynhHorst ClaubergSon Truong NguyenBob ChylakHui XuViola L. Acoff
  • Full Integration and Electrical Characterization of 3D Silicon Interposer Demonstrator Incorporating High Density TSVs and Interconnects
    Ken MiyairiMasahiro SunoharaJean CharbonnierMyriam AssousJean-Philippe BallyRobert CuchetHelene FeldisKei MurayamaMitsuhiro AizawaGilles SimonMitsutoshi Higashi
  • Radiation Mechanisms and Electromagnetic Interference in Ceramic Electronic Packages
    Jerry AguirreMarcos VargasPaul Garland
  • Development of Through Glass Vias (TGV) for 3D-IC Integration
    Aric ShoreyScott PollardJohn Keech
  • Making New With Old
    Nick Renaud-BezotMark Beesley
  • Biocompatible encapsulation and interconnection technology for implantable electronic devices
    Maaike Op de BeeckJohn O'CallaghanKaren QianBishoy M. MorcosAleksandar RadisicKarl MalachowskiM. F. AmiraChris Van Hoof
  • An Overview - Temporary Wafer Bonding / Debonding for 2.5D and 3D Technologies
    Rajen Chanchani
  • IC Package Optimization Targeting Multiple Form Factors
    John Park
  • Laminate Materials for Microfluidic PCBs
    Sarkis BabikianBrian SorianoG.P. LiMark Bachman
  • Investigation of electrical performance and mechanical reliability of device embedded power module
    Masaya TanakaKeisuke SawadaToru SerizawaShuji Sagara
  • Superior Drop Test Performance of BGA Assembly Using SAC105Ti Solder Sphere
    Weiping LiuNing-Cheng LeeSimin BagheriPolina SnugoveskyJason BraggRussell BrushBlake Harper
  • Response of Long Sculpted Wire Bonds to Vibrational Excitation
    Thomas F. MarinisJoseph W. Soucy
  • Comparison of Silver vs. Gold Systems in High-Q FTTF LTCC Inductors
    Matthew J. ClewellWilliam B. Kuhn
  • Cost effective 3D Glass Microfabrication for Advanced Packaging Applications
    Jeb H. FlemmingKevin DunnJames GoukerCarrie SchmidtRoger Cook
  • Predicting the Reliability of Zero-Level TSVs
    Greg CaswellCraig Hillman
  • Rediscovering Multilayer Rigid-Flex with Z-interconnect Technology
    Rabindra N. DasJohn M. LaufferFrank D. EgittoMark D. PoliksVoya R. Markovich
  • Meander Delay Compensation in High-Speed Digital Multilayer Packages
    Robert FryeKai Liu
  • Package-Interposer-Package (PIP): A Breakthrough Package-on-Package (PoP) Technology for 3D-Integration
    Rabindra N. DasFrank D. EgittoBarry BonitzErich KoppMark D. PoliksVoya R. Markovich
  • Comparison between Single & Multi Beam Laser Grooving of Low-K layers
    Jeroen van BorkuloRene HendriksPeter Dijkstra
  • Small Pitch Micro-Bumping and Experimental Investigation for Under Filling 3D Stacking
    Antonio La MannaK. J. RebibisJ. De VosL. BogaertsC. GeretsE. Beyne
  • Through Silicon Via (TSV) Technology Creates Electro-Optical Interfaces
    Phil Marcoux
  • Scallop Free Si Etching and Low Cost Integration Technologies for 2.5D Si Interposer.
    Yasuhiro MorikawaTakahide MurayamaToshiyuki SakuishiToshiyuki NakamuraTakashi KurimotoYuu NakamutaIsao KimuraKoukou Suu
  • Advanced Manufacturing Methods for Brazing High-Reliability Electronic Packages
    Iris Labadie
  • Study of Warpage and Mechanical Stress of 2.5D Package Interposers during Chip and Interposer Mount Process
    Takashi HisadaYasuharu YamadaJunko AsaiToyohiro Aoki
  • Effects of Extended Dwell Time on Thermal Fatigue Life of Ceramic Chip Resistors
    Elviz GeorgeMichael OstermanMichael PechtRichard Coyle
  • Thin Substrates Bursting into the Market
    Bernd K AppeltBruce SuDora LeeKidd LeeUno Yen
  • Propagation Delay Analysis in 3D Stacked Memory using Novel MOS Depletion Layer Modeling Approach for Through Silicon Via
    Kaushal KannanSarma G. HariharaSukeshwar Kannan
  • A Comparison of 25 Gbps NRZ & PAM-4 Modulation Used in Reference, Legacy, & Premium Backplane Channels
    Chad MorganAdam Healey
  • Fine Pitch Copper Interconnects for Next Generation Package-on-Package (PoP)
    Ilyas Mohammed
  • Package Reliability Monitored Drop Shock and Temperature Cycling Testing Progression and Advantages
    Michael Ferrara
  • Electrical Performance of Through-Silicon Vias (TSVs) for High-Frequency 3D IC Integration Applications
    Jui-Feng HungJohn H. LauPeng-Shu ChenShih-Hsien WuSheng-Che HungShinn-Juh LaiMing-Lin LiShyh-Shyuan SheuZhe-Hui LinChih-Sheng LinWei-Chung LoMing-Jer Kao
  • Thin PoP: Warpage Control for Thinner PoP Package in Mobile Applications
    Yuka TamadateSeiji SatoHitomi ImaiKota TakedaTakeshi MeguroTakashi Ozawa
  • Reliability Study of Reference Semiconductor Encapsulation Materials for Biocompatible Packaging
    Karl MalachowskiKaren QianMaaike Op de BeeckRita VerbeeckGeorge BryceHarold DekkersDeniz S. Tezcan
  • Accurate Prediction of Thermal Resistance of FET by Detailed Modeling of Heat Generation and Backend Stackup
    Qun WanDon WillisDaniel Jin
  • Thinner and Miniaturization Embedded Device Package, MCeP, for PoP and Module Application
    Kouichi TanakaNobuyuki KurashimaHajime IizukaKiyoshi OoiYoshihiro MachidaSatoshi ShirakiTetsuya Koyama
  • DESIGN AND PROCESS OPTIMIZATION OF THROUGH SILICON VIA INTERPOSER FOR 3D-IC INTEGRATION
    Pejman MonajemiMichael NewmanCyprian UzohCharles WoychikTerrence Caskey
  • Parylene as Thin Flexible 3-D Packaging Enabler for Biomedical Implants
    Jimin MaengDohyuk HaWilliam J. ChappellPedro P. Irazoqui
  • Obsolescence Management & the Impact on Reliability
    Cheryl TulkoffGreg Caswell
  • Mixed Attachment Technology Studies in RF & Optoelectronic Packages Requiring High Accuracy Placement
    Daniel D. EvansZeger Bok
  • Large Size Silicon Interposer and 3D IC Integration for System-in-Packaging (SiP)
    John LauPei-Jer TzengChau-Jie ZhanChing-Kuan LeeMing-Ji DaiJui-Chin ChenYu-Chen HsinShang-Chun ChenChien-Ying WuLi LiPeng SuJie XueMark Brillhart
  • High-Reliability Component Attachment Process for <5μm Placement Accuracy
    Donald J. BeckZeger BokDaniel Martinez
  • Virtual Ground Fence: A Simple Method for Protection against High Frequency Simultaneous Switching Noise
    Jesse BowmanA. Ege Engin
  • Smart and Quick Dk, Df Extraction Flow of Halogen-free and Lead-free Materials under Different Temperatures
    Chang-Chih LiuCheng-Hua TsaiWei-Ting ChenChang-Sheng ChengLi-Chi Chang
  • Quality and Reliability of 3D High-Performance Heterogeneous Integration through Die Stacking
    Bahareh BanijamaliLiam MaddenSuresh RamalingamEphrem Wu
  • A Numerical Study of Single Phase Dielectric Fluid Immersion Cooling of Multichip Modules
    Roy W. KnightSeth FincherSushil H. BhavnaniDaniel K. HarrisR. Wayne Johnson
  • Advanced Stepper Through-Silicon Alignment (TSA) Evaluation and Overlay of Distorted Bonded Wafer Stacks
    Doug SheltonC.Y. (Charles) Wang
  • Understanding and Controlling Cu Protrusions in 3D TSV Processing
    Seth KrugerKlaus HummlerRobert GeerKathleen DunnColin McDonoughAaron CordesJack EnloeBrian SappIqbal AliStefan PieperSitaram ArkalgudThomas Murray
  • A Practical Approach to Analyze Copper Surface Roughness Effects with Applications to Stripline Structures
    Xichen GuoJi ChenDavid R. JacksonMarina Y. KoledintsevaJames DrewniakChristopher Pan
  • Isothermal Aging Effects on the Thermal reliability Performance of Lead-Free Solder Joints
    Jiawei ZhangZhou HaiSivasubramanian ThirugnanasambandamJohn L. EvansM. J. Bozack
  • RF/Microwave Die Attach of Gallium Nitride Devices Achieving Less Than 1% Voiding in a Flux-Free Environment
    Pierino I ZappellaPaul W BarnesDavid MuhsBruce Wilson
  • A Process For Treating Woven Glass Cloth
    Dylan BodayMichael HaagJoe KuczynskiMarkus SchmidtMichael Wahl
  • High Frequency Signal Propagation in Through Silicon Vias
    Srinidhi Raghavan NarasimhanA. Ege Engin
  • Heterogeneous Process Development for Electronic Device Packaging with Direct Printed Additive Manufacturing
    R. X. RodriguezK. ChurchX. Chen
  • Mechanical Stress Analysis and Evaluation of Hybrid Land Grid Array Attached Large Form Factor Organic Modules
    John TorokShawn CanfieldYuet-Ying YuJiantao Zheng
  • Influence of Different Packaging and Footprint Technique for Microwave Absorptive Bessel Filter's Performance
    Akhlaq RahmanJim Norman
  • Underfill Dispensing for 3D Die Stacking with Through Silicon Vias
    Fuliang LeS. W. Ricky LeeJingshen WuMatthew M. F. Yuen
  • Design Optimization of Micro-channel Heat Exchanger embedded in LTCC
    Aparna AravelliSingiresu S. RaoHari K. Adluru
  • Stacked Chip Thermal Model Validation using Thermal Test Chips
    Thomas TarterBernie Siegal
  • Thermal Power of Mobile Application Processor
    Heung Kyu KwonJugnwook HwangHyunkwon ChungMunsik KangHyun Duk ChoYoung Min Kim
  • Photostabilization of i-line Photoresist and ARC Layer
    Zeliha YILMAZMurat PAKSema İMRAHORILYASAylin ERSOY
  • Low Temperature Hybrid Bonding of Organic/Inorganic Substrates at Atmospheric Pressure
    Akitsu Shigetou
  • Modeling in the Cloud: Web Hosted CPI Modeling for Fabless Design Houses and OSATs Method for Mechanical Stress Simulation across the Chip & Package Domains in 3D IC's
    Mark NakamotoKarthikeyan DhandapaniWei ZhaoAhmer SyedWei LinRiko Radojcic
  • High Temperature Packaging for SiC Power Transistors
    K. BrinkfeldtT. ÅklintC. SandbergP. JohanderD. Andersson
  • Manual Assembly of 400um Bumped-Die GaN Power Semiconductor Devices
    Stephan W. HenningLuke JenkinsSidni HaleChristopher G. WilsonJohn TennantJustin MosesMike PalmerRobert N. Dean
  • Gold Ball Wire Bonding with Heated Tool for Automotive Microelectronics
    David J Rasmussen
  • HIGH RELIABILITY HIGH MELTING LEAD-FREE MIXED BIAGX SOLDER PASTE SYSTEM
    HongWen ZhangNing-Cheng Lee
  • High Yield Embedding of 30μm Thin Chips in a Flexible PCB using a Photopatternable Polyimide based Ultra-Thin Chip Package (UTCP)
    T. SterkenM. Op de BeeckF. VermeirenT. TorfsL. WangS. PriyabadiniK. DhaenensD. CuypersJ. Vanfleteren
  • Development of Synergistic Opto-Electronic Sensing Platform based on Zinc Oxide Semiconducting Nanostructures
    Anurag GuptaBruce C. KimMitchell SprynEugene EdwardsChristina BrantleyPaul Ruffin
  • Glass Wafers as Support Carriers for Wafer Thinning Processes
    Aric ShoreyJohn KeechWindsor Thomas
  • Electrolytic Deposition of Fine Pitch Sn/Cu Solder Bumps for Flip Chip Packaging
    Stephen KennyKai MatejatSven LamprechtOlivier Mann
  • Characterization of Over Pad Metallization (OPM) for High Temperature Reliability
    Varughese MathewTu Anh Tran
  • Hardware Design for Multiple Gas Detection System Using Zeolite Coated with Nile Red
    Son NguyenZ. Joan DelalicDavid M. KargboJoel B. Sheffield
  • Electromigration Performance of Fine-Pitch Copper Pillar Interconnections
    Ahmer SyedChristopher J. BerryKarthikeyan DhandapaniPatrick ThompsonSeung-Hyun Chae
  • Realisation of High Temperature Electronics Packaging Technology for Sensor Conditioning and Processing Applications
    S T RichesC JohnstonA Lui
  • Characterization of silicate sensors on Low Temperature Cofire Ceramic (LTCC) substrates using DSC and XRD techniques
    Mary RualesKinzy Jones
  • Formulation of percolating thermal underfills using hierarchical self-assembly of micro- and nanoparticles by centrifugal forces and capillary bridging
    Thomas BrunschwilerGerd SchlottigSongbo NiYu LiuJavier V. GoicocheaJonas ZürcherHeiko Wolf
  • Electromigration Reliability of Glass Ceramic Multilayer Substrate with Various Surface Finishes
    Hiroshi MatsumotoAkira WakazakiShingo SatoTakashi OkunosonoChihiro Makihara
  • Evaluating the Impact of Dwell Time on Solder Interconnect Durability under Bending Loads
    Sandeep MenonMichael OstermanMichael Pecht
  • Assembly and Packaging of a Wireless, Chronically-Implantable Neural Prosthetic Device
    Kedar G. ShahA. TookerV. TolosaT. DeLimaW. BenettS. FelixH. ShethS. Pannu
  • Material Analysis of Lead Free Solder Deposited by Electrochemical Deposition
    Tom RitzdorfSam LeeIan Drucker
  • BGA Solder Life Prediction under Combined Power and Temperature Cycling Condition
    Fei ChaiMichael OstermanMichael Pecht
  • Electrical and Mechanical Performance of Quilt Packaging with Solder Paste by Pin Transfer
    Quanling ZhengM. Ashraf KhanAlfred M. KrimanGary H. Bernstein
  • Method to measure wafer stiffness in Fan-Out Wafer Level Package
    Jorge TeixeiraMário Ribeiro
  • Effects of the Impurities on the Embrittlement Phenomena of Electroplated Nickel Films
    Yoonchul SohnMinjong BaeInyong SongSangeui LeeDongouk KimKunmo ChuDongun KimSunghoon ParkHajin KimIntaek Han
  • Wedge Bonding RF and Microwave Devices
    Joe BubelLee Levine
  • Embedded Die Substrates for Power Applications
    Bernd K AppeltBruce SuUno YenKay Essig
  • Aerosol-Jet Printing for Functionalization of Prototyping Materials for Electronic Applications
    Johannes HörberChristian GothJörg Franke
  • Copper Wire Bonding: R&D to High Volume Manufacturing
    Bob ChylakHorst ClaubergJohn FoleyIvy Qin
  • Impact of etch factor on characteristic impedance, crosstalk and board density
    Abdelghani RenbiArash RissehRikard QvarnströmJerker Delsing
  • Formation of Through-Glass-Via (TGV) by Photo-Chemical Etching with High Selectivity
    Zingway PeiJui-Po SunHsin-Chen LaiPei-Jer TzengCha-Hsin LinTzu-Kun KuMing-Jer Kao
  • SYSTEMATIC FEEDBACK LOOP FOR SILICON DIE PICK&PLACE PROCESS IN RECONSTITUTED FAN-OUT EWLB WAFERS IN HIGH VOLUME PRODUCTION
    Alberto MartinsNelson PinhoHarald Meixner
  • Qualification of Polyimide Based Coverlays for 900 MHz and 2.40 GHz Microstrip Antenna Applications
    Deepukumar NairGlenn OliverJim Parisi
  • Evaluation of Exothermic Reactions in Cofired Platinum /Alumina Microsystems
    Ali KarbasiW. Kinzy Jones
  • Influence of thermal ageing on void content and shear strength for selected lead free solder die-attach
    K. C. OtiabaN. RajuR. S. BhattiS. MallikP.K. Bernasko
  • A Novel OPC Technique for 2D Critical Dimension Optimization of Sub-micron Patterns using an Experimental Methodology
    Murat PakZeliha YilmazAylin Ersoy
  • GHz High Frequency TSV for 2.5D IC Packaging
    Chi-Han ChenKuan-Chung LuChang-Ying HungPao-Nan LeeMeng-Jen WangChih-Pin HungHo-Ming TongTzyy-Sheng Horng
  • ACES characterization of damping in micro-beam resonators
    Jason ParkerXiuping ChenVu NguyenRyszard J. Pryputniewicz
  • Demonstration of Inkjet Printed Nanoparticle-based Inks for Solder Bump Replacement
    Jacob SadieSteven VolkmanVivek Subramanian
  • Highly Conducting Carbon Nanotube Composite for Light-Weight Electric Heating Unit Applications
    Kunmo ChuSunghoon ParkSangeui LeeDongouk KimYoonchul SohnDongun KimMinjong BaeHajin KimIntaek Han
  • Use of Wire Bonding to Study Bond Pad Damage from Wafer Probe
    Stevan HunterJonathan L. ClarkDarin HornbergerLance Rubio
  • Thin-film High Voltage Capacitors for Hybrid Electric Vehicle Inverter Applications
    M. Ray FairchildCarl W. BerlinD.H.R. SarmaRalph S. TaylorHan S. LeeSteven E. Staller
  • Reliability analysis of low-Ag BGA solder joints using four failure criteria
    Erin KimuraJianbiao Pan
  • Novel ESD Protection Scheme for Testing High Voltage LDMOS
    Sukeshwar KannanBruce KimFriedrich TaenzlerRichard AntleyKen Moushegian
  • Packaging of High Power UV-LED Modules on Ceramic and Aluminum Substrates
    Marc SchneiderBenjamin LeyrerChristian HerboldStefan Maikowske
  • Dicing Development for low-k Copper Wafers using Nickel-Palladium-Gold Bond Pads for Automotive Application
    Tu Anh TranVarughese MathewWen Shi KohK. Y. YowY. K. Au
  • A Low Firing Temperature Copper Conductor for use on an Aluminum Metal Compatible Dielectric in LED Thermal Substrate Applications
    Samson ShahbaziSteve GrabeyRyan Persons
  • PoP Package Warpage Contributors' Characterization and Impact Analysis
    Shengmin Wen
  • Optimization of Ag Composition in Cu Pillar Bumps with Sn-xAg Solders
    Moon Gi ChoHwan Sik LimSun Hee ParkYong Hwan KwonJaesik ChungJinho ChoiEun-Chul Ahn
  • Solder Joint Ductility
    Robert DarveauxMichael JohnsonCorey Reichman
  • How to Deal with Resonances in Wirebonding
    Josef SedlmairUwe Nacke
  • Development of Printed Power Packaging for a High Voltage SiC Module
    Haotao KEDouglas C Hopkins
  • Planarization of Deep Structures Using Self-Leveling Materials
    Dongshun BaiMichelle FowlerCurtis PlanjeXie Shao
  • Novel ultra-compact quad-band System-in-Package (SiP) module with IC embedded in substrate based on SESUB technology.
    V. SieroshtanG. SevskiyP. KomakhaO. AleksieievA. BuryginO. ChaykaO. RubanM. ShevelovK. KatoA. HoribeH. FujiokaK. RuffingP. HeideM. Vossiek
  • Additive Manufacturing of Fine Lines and Embedded Electronics for use in Chip Carriers and Microelectronic Systems
    Scott LauerWhitten LittlePier BenciTim SchmittJohn Mazurowski
  • European R&D Trends in wire bonding technologies
    M. Schneider-RamelowJ.-M. GöhreU. GeißlerS. SchmitzK.-D. Lang
  • XTRONIC®: Enabler of Improved Performance with Reduced Precious Metal Usage in Microelectronics
    D.M. BaskinB.C. MuñozJ.S. SylvesterJ.P. CahalenA.C. Lund
  • Design and Robustness of Quilt Packaging Superconnect
    M. Ashraf KhanJason M. KulickAlfred M. KrimanGary H. Bernstein
  • Pb-free PBGA Design Points to Improve Handling Robustness
    Isabel de SousaBrian RoggemanOswaldo ChaconNiki SpencerMamoru Ueno
  • Thermomechanical Design for Fine Pitch 3D-IC Packages
    Akihiro HoribeSayuri KoharaKuniaki SueokaKeiji MatsumotoYasumitsu OriiFumiaki Yamada
  • The Distribution and Transport of Alpha Activity in Tin
    Brett M. Clark
  • A Wafer-level System Integration Technology Incorporates Heterogeneous Devices
    Hiroshi YamadaYutaka OnozukaAtsuko IidaKazuhiko ItayaHideyuki Funaki
  • Thin-Film Signal and Power Redistribution Layers Based on AL-X and Cu
    John BaileyAlexander PfeiffenbergerCharles EllisMike PalmerTamara Issac-SmithMichael Hamilton
  • Characterization of Interconnects and RF Components on Glass Interposers
    Ivan NdipMichael TöpperKai LöbbickeAbdurrahman ÖzStephan GuttowskiHerbert ReichlKlaus-Dieter Lang
  • Measurement-based Signal Quality Test of High-speed TSV Channel
    Heegon KimJonghyun ChoDaniel H. JungJonghoon J. KimJoungho KimJun So PakKwang-Seong ChoiHyun-Cheol Bae
  • Electromigration Performance of Flip-Chips with Lead-Free Solder Bumps between 30 μm and 60 μm Diameter
    Rainer DohleStefan HärterAndreas WirthJörg GoßlerMarek GorywodaAndreas ReinhardtJörg Franke
  • 3D Electromagnetic Modeling of Through Silicon Vias and Interposers in Electronic Packaging
    Darryl KostkaAntonio Ciccomancini Scogna
  • Miniaturization of Electronic Substrates for Medical Device Applications
    Frank D. EgittoRabindra N. DasGlen E. ThomasSusan Bagen
  • Assessment of XRF Technique as a Method to Measure Percent Ag in SnAg Solders for Flip Chip Applications
    Jennifer D SchulerChia-Hsin ShihCharles L ArvinKyungMoon KimEric Perfecto
  • Development of High-Dielectric-Strength Ceramic Film Capacitors for Advanced Power Electronics
    Beihai MaManoj NarayananShanshan LiuSheng TongU. (Balu) Balachandran
  • A Ceramic Tubular Probe For Online Substance Concentration Measurement, Manufactured By Ceramic Injection Molding
    Matthias HartmannBertram Schmidt
  • Getters and Design to Reliability: A Tool For Lifetime Assurance
    Richard C. KullbergBradley L. Phillip
  • Effect of preformed IMC Layer on Electromigration of Solder Capped Cu Pillar Bump Interconnection on an organic substrate
    Yasumitsu OriiKazushige ToriyamaSayuri KoharaHirokazu NomaKeishi OkamotoKeisuke Uenishi
  • Highly Flexible Die Attach Adhesives for MEMS packages
    Tobias Königer
  • Process integration solution for damage-free bevel for deep Si etch applications
    Bivragh MajeedNina TutunjyanPaolo FioriniDeniz. S. Tezcan
  • Challenges in 3D Inspection of Micro Bumps Used in 3D Packaging
    Reza Asgari
  • Epidermal electronics for health and fitness monitoring
    Conor RaffertyMitul DalalDan DavisBrian ElolampiYung-Yu HsuStephen LeeLauren KlinkerBriana Morey
  • Development of Silver Nanoparticle Ink for Printed Electronics
    Yiliang WuPing LiuTony Wigglesworth
  • 3D Integration of Wide IO Memory Cube Stacking to 28 nm Logic Chip with High Density TSV through a Fabless Supplier Chain
    S.Q. GuD.W. KingV. RamachandranB. HendersonU. RayM. Nowak
  • Process challenges in 0-level packaging using 100μm-thin chip capping with TSV
    Nga P. PhamVladimir ChermanNina TutunjyanLieve TeugelsDeniz S. TezcanHarrie A.C. Tilmans
  • Handling technology for 0.075-square mm powder IC chip
    Hideyuki Noda
  • CO2 Technology Transforms Manufacturing
    David Jackson
  • Stacking Aspects in the View of Scaling.
    Joeri De VosAntonio La MannaRobert DailyKenneth June RebibisEric Beyne
  • A Novel Packaging Concept for Electronics in Textile UHF Antennas
    Christian BoehmeRené VierothMervi Hirvonen
  • A Novel Wafer-Level Double Side Packaging and Its Microwave Performance
    Xiao ChenJiajie TangGaowei XuLe Luo
  • Planar Power Inductor with Magnetic Film for Embedded LSI Package
    Tomoharu FujiiKazutaka KobayashiHiroshi ShimizuShinji NakazawaToshiro SatoFumihiro SatoHiroki Kobayashi
  • Thermal Characterization and Simulation of a fcBGA-H device
    Eric OuyangWeikun HeYongHyuk JeongMyoungSu ChaeSeonMo GuGwang KimBilly Ahn
IMAPSource Conference Papers
Kannan, Kaushal, Sarma G. Harihara, and Sukeshwar Kannan. 2012. “Propagation Delay Analysis in 3D Stacked Memory Using Novel MOS Depletion Layer Modeling Approach for Through Silicon Via.” IMAPSource Proceedings 2012 (1): 318–25. https://doi.org/10.4071/isom-2012-TP25.
Save article as...▾

View more stats

Powered by Scholastica, the modern academic journal management system